Standard Cost CardDirect materials (7 pounds at $5 per pound)$35.00Direct labor (0.80 hours at $10)8.00Variable overhead (0.80 hours at $5 per hour)4.00Fixed overhead (0.80 hours at $8 per hour)6.40$53.40
Variances
Costs
Total Standard Cost
Price
Quantity
Direct materials$409,500$8,386 F$9,800 UDirect labor93,6005,035 U7,100 U
- How many units were produced during the period?
- (Round answer to 2 decimal places, e.g. 1.25.)
- (Round answer to 2 decimal places, e.g. 1.25.)





